A comprehensive, sourced directory of announced and operating data center campuses across Michigan. Every record references state economic development announcements, MPSC utility filings, or local planning commission agendas. Missing or undisclosed figures are strictly labeled 'Not publicly disclosed'.

Methodology: We track projects within the state boundaries of Michigan. Interstate projects across regional borders are excluded.
Showing 8 of 8 tracked projects
OperatingUpdated 2024 - 2025

Switch GRR (The Pyramid Campus)

Gaines Township / Grand Rapids, Kent County (West Michigan)

The premier multi-tenant hyperscale ecosystem in Michigan, housed within the landmark Steelcase Pyramid and adjacent expanses. Powered by 100% certified green energy via Consumers Energy tariffs and protected by Michigan PA 281/282 exemptions.

Operator
Switch
Announced Investment
$5+ Billion (Long-term master plan)
Power Capacity
110+ MW critical load (Served by Consumers Energy)
Cooling System
Proprietary Switch TSC (Thermal Separated Compartment) 100% exterior economizers with near-zero evaporative water loss
Jobs (Announced Trades / Ops)
1,200+ construction trades peak; ~250 permanent technical, engineering, security and operations roles
Switch: Grand Rapids Prime Campus & Michigan Public FilingsPublic Record
ApprovedLate 2024 - 2025

Microsoft Calhoun County Advanced Cloud Campus

Marshall / Battle Creek Area, Calhoun County (West Michigan)

Approved multi-building cloud and AI infrastructure campus near the I-94 corridor in southwest Michigan, connecting to primary regional transmission pathways and dual utility feeds.

Operator
Microsoft Corporation
Announced Investment
$1.0+ Billion initial phase
Power Capacity
Requested 150+ MW interconnection (MISO queue)
Cooling System
Direct evaporative with ultra-low water dry-cooling mode; Microsoft zero-water replenishment commitment by 2030
Jobs (Announced Trades / Ops)
800+ union construction trades; 60-90 permanent operations & site reliability technicians
MEDC Strategic Fund & Calhoun County Industrial Development BoardPublic Record
PlanningJanuary 2025

Metro Detroit AI & Hyperscale Infrastructure Park

Highland Park / Detroit Metro, Wayne County (Metro Detroit & Southeast)

Major brownfield redevelopment project repurposing legacy automotive and industrial acreage into dense AI computing pods, utilizing DTE Energy high-voltage 345 kV loop infrastructure.

Operator
Confidential Hyperscale Developer / DTE Energy Interconnect
Announced Investment
$1.5+ Billion (Estimated total buildout)
Power Capacity
200 MW requested transmission interconnection
Cooling System
Closed-loop liquid direct-to-chip with air-cooled chillers; zero open cooling towers planned
Jobs (Announced Trades / Ops)
950+ construction trades (IBEW Local 58); 85 permanent engineering & high-tech positions
Michigan PSC DTE Large Load Interconnection Docket ReviewPublic Record
PlanningNovember 2024

Capital Region Tech Center & Cloud Gateway

Lansing, Ingham County (Mid-Michigan / Capital)

Mid-Michigan municipal utility-backed technology cluster adjacent to high-speed fiber rings and Michigan State University research computing backbones.

Operator
Consortium / Lansing Board of Water & Light (BWL)
Announced Investment
$450 Million
Power Capacity
65 MW critical capacity
Cooling System
Closed-loop chilled water with free-air economizers (leveraging Michigan's cold fall-to-spring ambient temperatures)
Jobs (Announced Trades / Ops)
350 construction trades; 40 permanent operational roles
Lansing Board of Water & Light Industrial Resource AssessmentPublic Record
OperatingOctober 2024

Ann Arbor Automotive Tech & Edge Compute Center

Ann Arbor / Ypsilanti, Washtenaw County (Metro Detroit & Southeast)

Operating high-density edge compute facility providing ultra-low latency processing for connected vehicle testing, automotive research, and enterprise cloud workloads.

Operator
Enterprise Colocation & Autonomous Mobility Consortium
Announced Investment
$280 Million
Power Capacity
35 MW
Cooling System
High-efficiency dry coolers with adiabatic trim for peak summer periods
Jobs (Announced Trades / Ops)
180 construction trades; 35 permanent facility engineers
MEDC Technology Development Records & Washtenaw County FilingsPublic Record
ProposedFebruary 2025

Genesee County Industrial Digital Park

Flint / Grand Blanc, Genesee County (Thumb & Tri-Cities)

Proposed conversion of former industrial manufacturing parcels along I-75 with existing rail, heavy electrical substations, and interstate logistics access.

Operator
Private Infrastructure Development Fund
Announced Investment
$800 Million (Phase 1 evaluation)
Power Capacity
100 MW study
Cooling System
Waterless air-cooled modular chillers (preserving regional municipal water supplies)
Jobs (Announced Trades / Ops)
500 construction trades; 50 permanent operational roles
MPSC Electric Large-Customer Study & County Land AgendasPublic Record
ProposedDecember 2024

Southwest Michigan Clean Compute Campus

Kalamazoo / Battle Creek, Kalamazoo County (West Michigan)

Proposed campus leveraging southwest Michigan's robust transmission backbone, fiber routes between Chicago and Detroit, and proximity to renewable wind/solar farms.

Operator
Hyperscale Energy & Infrastructure Partners
Announced Investment
$1.2+ Billion
Power Capacity
160 MW planned interconnect
Cooling System
Ultra-low consumption hybrid closed-loop with heat recovery for adjacent district heating
Jobs (Announced Trades / Ops)
700 construction trades; 75 operational positions
EGLE Water Resources Division & Municipal Planning ReviewPublic Record
PlanningEarly 2025

Upper Peninsula Clean Energy & Research Compute

Marquette Area, Marquette County (Upper Peninsula & Northern)

Cold-climate data campus study taking advantage of northern ambient temperatures to run near-zero mechanical cooling, backed by dedicated hydroelectric and regional grid resources.

Operator
Upper Peninsula Power Company (UPPCO) / Tech Partner
Announced Investment
Estimated $350 Million
Power Capacity
45 MW initial study
Cooling System
100% natural free-air cooling utilizing Lake Superior regional climate year-round
Jobs (Announced Trades / Ops)
200 construction trades; 25 permanent roles
U.P. Economic Development Alliance & MPSC Special FilingsPublic Record